TrailwrightBratt
Active member
Saturday, June 4 National Trails Day Orford N.H. The Dan Doan Trail: It is time again to continue the repair and maintenance started a few years ago. The work will consist of adding more water bars, cleaning existing structures and if enough help installing rock steps. Water bars is #1 priority to control the erosion and stabilize what is there now. It is hoped that we can get enough interest to form a local group that would adopt this trail and continue the repairs and assist the Doan family in preserving Dan’s legacy. Just one day a year is not enough to get this trail protected. What has been done so far has helped the trail heal in areas that have improved somewhat but much more is needed. Tools provided, bring lunch, water, gloves etc. and a desire to help out. We meet at 8:30 at the junction of NH Rt. 25A and Quintown Rd. From NH Rt. 25 in Wentwoth it is about 10.5 miles on 25A (on the left) From Rt.10 in Orford it is 3.9 miles on NH Rt. 25A to Quintown Rd. (on the right). Contact Hal at 603-286-3506 or [email protected]. for more information.