9 hearty Trailwrights met to do some needed rock work on the Rollins trail in Rollins State Park.
We tackled two areas of concern. Both needed rock steps and some smoothing of the treadway.
In both locations 6 single rock steps and 3 double rock steps were installed for a total of 18. Not a bad day at all. Lot's of fun as usual. Great views for lunch and hardly any BUGS!!!.
Before:
After:
Before:
After:
To see all our pictures go to:
https://picasaweb.google.com/112780185109256920004/KearsargeMay2013
Submitted by Hal.