Brewster
Member
Trailwrights will be leading and assisting the adopter of the Mt. Pemigewasset Trail continuing improvements made in prior years. Mainly rock work and drainage will be the order of the day. We will meet at the Flume Visitor’s Center in the upper lot. Be aware that Exit 4A may still be closed during the repaving of I93. Meeting time is 8:30 at the entrance to the Bike Path. Tools supplied. As always, work gloves, water, lunch, sturdy footwear and a love of trails are the only requirements. Experience is NOT a requirement.