I noticed a blurb in the Berlin NH Paper that there is another windfarm being actively developed north of the Millsfield windfarm. The Millsfield farm has most of the approvals and is waiting for a wetlands permit prior to start of construction. The proposed site looks to be north of RT 26 near Grafton Notch. The company, Wagner Woodlands manages a lot of timberland in the area.
The proposed 180 MW windfarm would require a major transmission system upgrade to support it. Most likely installing larger towers on the existing right of way that roughly wraps around the northern portion of the WMNF. As the state is still in the process of studying it and figuring out how to pay for the upgrade, I dont think there is going to be a lot of clearing going on anytime soon.
The limited description is on page 8
http://www.laconiadailysun.com/BerlinPDF/2009/11/24B.pdf
The proposed 180 MW windfarm would require a major transmission system upgrade to support it. Most likely installing larger towers on the existing right of way that roughly wraps around the northern portion of the WMNF. As the state is still in the process of studying it and figuring out how to pay for the upgrade, I dont think there is going to be a lot of clearing going on anytime soon.
The limited description is on page 8