We were there yesterday and saw for ourselves that M.E. Latulippe Construction of Ashland have been very busy lately. What amounts to a new road, just west of the damaged section, is practically done. If the gate hadn't been locked, we could have driven the 2.3 miles to the north Trailhead of the Tunnel Brook Trail, except for two little culverts that look like they could be filled in a couple of hours. There were 8 or 10 construction vehicles at various spots and I assume they are putting on the finishing touches.
The Benton Trailhead, which is 1.5 mile from the gate, has a new Trail sign.